# How to Plumb Two Dehumidifiers in Parallel

> Learn to connect Aprilaire 1850 and Santa Fe dehumidifiers on a shared drain with valves, using clear vinyl tubing and reliable drain hoses.

- Date: 2026-11-09
- Author: Expert Guide Team
- Category: Plumb Two Dehumidifiers in Parallel:
- Canonical: https://wholehousehumidity.com/blog/how-to-plumb-two-dehumidifiers-in-parallel/

# How to Plumb Two Dehumidifiers in Parallel: Step-by-Step Guide for Aprilaire 1850 & Santa Fe (Shared Drain, Valves & Best Practices)

This guide explains how one can install two high‑capacity dehumidifiers—an Aprilaire 1850 and a Santa Fe model—on a common [drain](#) line. The reader will learn how to size the tubing, install leak‑proof drain hoses, integrate isolation valves, and apply best practices to ensure reliable operation. Proper plumbing reduces water damage risk, improves energy efficiency, and simplifies maintenance.

## What You Will Need

- [Eastman 5/8" ID Vinyl Tubing](https://amazon.com/dp/B08SPL3MXH?tag=wpem020126-20&ascsubtag=wholehousehumidity-com) – 10 ft, clear PVC, 4.6★ rating, $12.28
- [Eastrans 1/2" ID Vinyl Tubing](https://amazon.com/dp/B07HF6FQ7N?tag=wpem020126-20&ascsubtag=wholehousehumidity-com) – 25 ft, flexible PVC, 4.6★ rating, $16.99
- [Eastman 1/2" ID Vinyl Tubing](https://amazon.com/dp/B07NQSN1ZJ?tag=wpem020126-20&ascsubtag=wholehousehumidity-com) – 20 ft, clear PVC, 4.6★ rating, $12.97
- [Ebusin Dehumidifier Drain Hose](https://amazon.com/dp/B0B7VYKLLP?tag=wpem020126-20&ascsubtag=wholehousehumidity-com) – 12 ft, brass‑fitted, 4.5★ rating, $21.98
- [Nkiy Quen Dehumidifier Drain Hose](https://amazon.com/dp/B0D7Q2S1WL?tag=wpem020126-20&ascsubtag=wholehousehumidity-com) – 16.5 ft, corrugated PE, 4.5★ rating, $19.99
- Two 3/4" FHT isolation valves (commercial grade)
- PVC cutter or sharp utility knife
- Hose clamps (compatible with 3/4" FHT)
- Mounting brackets or zip ties
- Silicone sealant (optional for extra leak protection)

## Step 1 – Plan the Layout and Measure

One should begin by sketching the intended plumbing route. The Aprilaire 1850 typically discharges near the floor, while the Santa Fe unit may be mounted higher on a wall. Identify the nearest floor [drain](#) or condensate pump location. Measure the distance from each unit’s drain outlet to the common drain point. Add an extra 12‑18 inches to accommodate elbows and valve placement. Accurate measurement prevents excess cutting and ensures a clean, professional appearance.

## Step 2 – Select Appropriate Tubing Diameter

Both dehumidifiers output condensate at low pressure, usually below 30 PSI. The Eastman 5/8" ID tubing offers a larger bore that reduces friction loss over longer runs, making it ideal for the primary shared line. The Eastrans 1/2" ID and Eastman 1/2" ID tubes are suitable for the short branch lines from each unit to the main line. Selecting the correct inner diameter (ID) maintains steady flow and prevents clogging.

Key reasons for choosing these products:

- Clear PVC allows visual inspection of water quality and potential sediment buildup.
- FDA‑compliant material ensures safety if the condensate is ever repurposed for irrigation.
- Pressure ratings (19‑55 PSI for Eastman, 60 PSI for Eastrans) exceed the expected condensate pressure, providing a safety margin.

## Step 3 – Cut and Prepare the Tubing

1. Using a PVC cutter, trim the Eastman 5/8" ID tubing to the measured length of the main drain line.
2. Cut the Eastrans 1/2" ID and Eastman 1/2" ID tubes to the lengths required for each dehumidifier’s branch.
3. Deburr the cut ends with a utility knife to avoid tearing the tubing during installation.
4. Test fit each piece before proceeding to ensure proper alignment with the valve ports.

Because the tubing is flexible, one can gently bend it around obstacles without kinking. The smooth interior of both Eastman and Eastrans products prevents sediment accumulation, which is essential for long‑term reliability.

## Step 4 – Install Isolation Valves

Isolation valves allow each dehumidifier to be serviced independently without draining the entire system. Install a 3/4" FHT valve on the branch line of each unit before connecting the tubing. Tighten the valve body onto the dehumidifier’s outlet using a wrench, taking care not to over‑tighten and damage the plastic threads.

After the valve, attach the appropriate branch tubing (Eastrans 1/2" ID for the Aprilaire and Eastman 1/2" ID for the Santa Fe). Secure the connection with a hose clamp to provide a leak‑proof seal. The use of clamps is recommended because the rubber‑lined clamps distribute pressure evenly, reducing the risk of tubing rupture.

## Step 5 – Connect the Main Drain Hose

For the shared drain, one may choose either the Ebusin Dehumidifier Drain Hose or the Nkiy Quen Dehumidifier Drain Hose. The Ebusin hose features a nickel‑plated brass fitting that offers superior sealing performance, making it ideal for permanent installations. The Nkiy Quen hose provides a longer 16.5 ft length, useful when the drain point is farther away.

Attach the chosen hose to the downstream end of the Eastman 5/8" ID main line using a 3/4" FHT connector. Ensure the rubber adapter fits snugly and place the supplied clamp over the joint. Tighten the clamp until it is firm but not distorted.

Route the hose downhill toward the floor drain, using mounting brackets or zip ties to keep it out of high‑traffic areas. If the hose must travel horizontally for a distance, support it every 3‑4 ft to prevent sagging.

## Step 6 – Secure All Connections and Test for Leaks

1. Open both isolation valves slowly and observe the flow from each dehumidifier.
2. Check each joint for drips. If a leak is detected, tighten the corresponding clamp or apply a thin bead of silicone sealant around the connection.
3. Run each unit for at least 15 minutes to confirm steady drainage without blockage.
4. Close one valve while leaving the other open to verify that the isolation function works as intended.

Because the tubing is transparent, any trapped air bubbles become visible and can be purged by gently tapping the line. Removing air improves condensate flow and reduces the chance of intermittent stoppage.

## Step 7 – Finalize Installation and Clean Up

Secure the remaining slack of tubing with zip ties, leaving a small amount of extra length for future adjustments. Label each valve with the corresponding unit name to aid future maintenance. Dispose of any cut off tubing pieces in accordance with local recycling regulations.

Document the installation with photographs and note the product serial numbers. This record simplifies warranty claims and assists service technicians.

## Tips & Pro Tips

- When installing in a basement, consider adding a condensate pump if the floor drain is below the dehumidifier’s outlet level.
- Use a drip loop in the main hose to prevent back‑flow when the unit powers down.
- Periodically inspect the clear tubing for discoloration, which may indicate bacterial growth; flushing with a diluted bleach solution can mitigate this.
- For environments with temperatures near the lower limit of the tubing (23°F for Eastrans), insulate the hose to prevent condensation freezing.
- The Ebusin hose’s ten‑year guarantee provides peace of mind for long‑term installations.

## Troubleshooting

ProblemPossible CauseSolution
Slow drainagePartial blockage in branch tubingDetach the branch, flush with water, and replace if internal damage is observed.
Leak at valveImproper clamp tensionRe‑tighten clamp evenly; add silicone sealant if leak persists.
Hose disconnectsIncorrect FHT sizeVerify that the hose connector matches the 3/4" FHT standard; use the Nkiy Quen hose’s adjustable connector if needed.

## Conclusion

By following this step‑by‑step guide, one can successfully plumb an Aprilaire 1850 and a Santa Fe dehumidifier in parallel, sharing a single drain line while retaining independent control through isolation valves. The use of clear PVC tubing and reliable drain hoses ensures a leak‑free, low‑maintenance system that meets both performance and safety standards. Proper installation extends the lifespan of the equipment and protects the home from moisture‑related damage.

## Frequently Asked Questions

### Can I connect an Aprilaire 1850 and a Santa Fe dehumidifier to the same drain line?

Yes, both units can share a common drain line if the tubing is sized for the combined water flow and proper isolation valves are installed.

### What tubing size should I use for a shared drain between two high‑capacity dehumidifiers?

Use at least 5/8" ID vinyl tubing for the main drain line and 1/2" ID flexible tubing for each unit’s outlet to handle the maximum combined discharge rate.

### Why are isolation valves important when plumbing dehumidifiers in parallel?

Isolation valves let you shut off or service one unit without draining the other, preventing leaks and simplifying maintenance.

### How can I prevent leaks in the shared drain system?

Secure all hose connections with hose clamps, slope the tubing at a minimum of 1/4" per foot toward the drain, and use leak‑proof fittings or gaskets.

### What maintenance steps should I follow after installing parallel dehumidifiers?

Periodically inspect hose clamps, clear any debris from the drain line, and test each isolation valve to ensure proper shut‑off and flow.
